Institutional/Public · Pueblo, Colorado

Dennis Maes Judicial Building

Structural steel detailing for a modern civic courthouse.

LocationPueblo, Colorado
Client and fabricatorZimmerman Metals
Structural steel1,270 tons
Building areaApproximately 177,000 square feet
Completion2015

Project overview

A contemporary center for Pueblo County’s judicial services.

The Dennis Maes Judicial Building was developed as part of Pueblo County’s effort to consolidate and modernize its judicial facilities.

The approximately 177,000-square-foot courthouse brings District Court, County Court, jury operations, judicial administration and Sheriff judicial services together within a single civic building.

Working for Zimmerman Metals, our team provided structural steel detailing for approximately 1,270 tons of steel.

Transparency, accessibility and a strong civic identity.

Designed by DLR Group, the courthouse presents a contemporary interpretation of the traditional American “courthouse on the green.”

Its architecture combines modern materials with open public spaces intended to make the building accessible and easy to navigate. The most recognizable element is the large glass entrance rotunda, which serves as both a central gathering space and a primary wayfinding feature.

Inside, curved wood latticework references Pueblo’s industrial and cultural heritage, giving the public areas a distinctive local character.

Transforming a redeveloped site into a new civic destination.

The courthouse was constructed on a redeveloped brownfield site, giving previously used land a new public purpose.

The project established a consolidated judicial center while contributing to the modernization of Pueblo County’s civic infrastructure. Its combination of transparency, open spaces and contemporary materials creates a recognizable public building designed around both operational requirements and the visitor experience.

Project team and technical details
Alternative project name
Pueblo County Judicial Building
Engineer
MGA Structural Engineers, Inc.
Architect
DLR Group
General contractor
H.W. Houston Construction Co.
Primary scope
Structural steel detailing
Sustainability
LEED Silver
Primary use
County courthouse and judicial administration

Detailing scope

Fabrication-ready information for a large and functionally diverse courthouse.

01

1,270-ton courthouse steel frame

Structural steel detailing for Zimmerman Metals covered the judicial, administrative and public areas within the 177,000-square-foot facility.

02

Public entrance and circulation interfaces

The steel package was coordinated with the glass entrance rotunda, open gathering areas and distinctive architectural finishes.

03

Court and secure-area requirements

Structural information supported the building’s courtrooms, jury facilities, administrative areas and secure judicial functions.

04

Fabrication and erection deliverables

The engineering design was translated into accurate, coordinated information for the fabrication and field assembly of the steel frame.

Model to field

Coordinating the Pueblo Justice Judicial Center model for fabrication and field use.

Dennis Maes Judicial Building structural model01 / Coordinated model
Coordinated structural model for Pueblo Justice Judicial Center.
Dennis Maes Judicial Building steel erection02 / Fabrication & field
Fabrication and construction context for Pueblo Justice Judicial Center.

Technical complexity

Coordination and detailing challenges.

01

Glass rotunda and prominent public spaces

Steel needed coordination with the large entrance, open circulation areas and architectural finishes defining the building’s public face.

02

Public and secure functions together

The courthouse combined visitor spaces with court, jury and Sheriff functions, creating varied structural coordination requirements.

03

Consistent information across the frame

The 1,270-ton package needed accurate fabrication and erection data across the building’s different judicial and administrative areas.

Our approach

Supporting architecture, security and public circulation within one structure.

The building’s combination of judicial functions and prominent architectural spaces required careful coordination of the structural steel with the broader project design.

Important coordination considerations included:

  • the large public entrance and glass rotunda,
  • open gathering and circulation spaces,
  • court and jury facilities,
  • administrative areas,
  • secure judicial and Sheriff functions,
  • interfaces with distinctive architectural finishes,
  • fabrication and erection requirements for the structural frame.

The detailing process had to support these varied building functions while maintaining accurate and consistent information throughout the steel package.

Fabrication-ready information for a large and functionally diverse courthouse.

Our team developed the structural steel detailing package for the project’s 1,270 tons of steel.

A courthouse of this scale brings together numerous space types, including public circulation areas, courtrooms, administrative offices, jury facilities and secure judicial functions. Accurate detailing was essential to translating the engineering design into consistent information for fabrication and erection.

The work supported Zimmerman Metals with coordinated deliverables for the building’s structural steel package.

Project result

A consolidated judicial facility with a contemporary civic presence.

Completed in 2015, the Dennis Maes Judicial Building created a centralized home for Pueblo County’s principal judicial services.

The facility combines the practical requirements of a modern courthouse with an architectural identity rooted in openness, accessibility and local history. Its LEED Silver certification also reflects the project team’s commitment to more sustainable public infrastructure.