Primary steel plate girders
Approximately 490 tons of bridge steel were modeled and detailed for the SH-16 / SH-44 interchange.
Infrastructure & Transportation
490 tons of bridge steel modeled and detailed for a new highway interchange.
Project overview
The bridge forms part of the new State Highway 16 and State Highway 44 interchange in Star, Idaho.
The interchange will allow SH-16 traffic to travel freely over SH-44 while providing ramp connections between the two highways. It is part of the Idaho Transportation Department’s broader extension of SH-16 through the rapidly growing Treasure Valley.
Working for TrueNorth Steel, our team modeled and detailed approximately 490 tons of structural steel.
Construction of the SH-16/SH-44 interchange began in August 2025. When completed, the interchange will replace the existing at-grade intersection and allow SH-16 to pass over SH-44.
The interchange is one of several being constructed as part of the SH-16 extension. The complete corridor is currently expected to open in 2027.
Detailing scope
Approximately 490 tons of bridge steel were modeled and detailed for the SH-16 / SH-44 interchange.
The Tekla model included the additional steel elements forming the complete bridge package for TrueNorth Steel.
Steel components and bridge geometry provided the basis for the fabrication documentation.
The coordinated package also included erection information, with approximately 400 hours devoted to modeling and detailing.
Technical complexity
The modeling process focused on defining the primary bridge members and their geometry accurately in Tekla Structures.
Associated components were developed alongside the primary girders to keep the bridge steel within a coordinated structural reference.
Fabrication and erection information needed to remain consistent with the defined structural components and bridge geometry.
Our approach
Our team used Tekla Structures to define the structural steel components and represent the bridge geometry within a single coordinated model.
The detailing process focused on:
Approximately 400 hours were dedicated to the modeling and detailing scope.
Project result
Our team completed the Tekla model and detailing package for approximately 490 tons of bridge steel.
Construction of the broader SH-16 corridor and its interchanges remains in progress, with completion currently planned for 2027.