Infrastructure & Transportation

Bozeman Airport

Coordinating 1,260 tons of steel across structure, timber and glass.

LocationBelgrade, Montana
Client and fabricatorWMK & Co.
Structural steelApproximately 1,260 tons

Project overview

Structural steel detailing for a major airport expansion in Montana.

The East Terminal Expansion is part of Bozeman Yellowstone International Airport’s response to continued growth in passenger traffic.

The multi-phase project will expand the east end of the terminal, including Concourse A, baggage claim, passenger screening and airport administration areas. The complete expansion is currently planned to continue through 2030.

Working for WMK & Co., our team is providing structural steel detailing for approximately 1,260 tons of steel.

Project team and technical details
Owner
Gallatin Airport Authority
Steel detailing period
2025–2026
Overall expansion completion
Projected for 2030
Structural engineer
Morrison-Maierle
Architect
Hennebery Eddy Architects
General contractor
Martel Construction
Primary scope
Structural steel detailing
Detailing platform
Tekla Structures
Coordinated materials
Structural steel, glulam, concrete and CMU
Key secondary steel
Tube framing supporting the curtain wall
Primary challenges
Steel-to-glulam coordination, existing CMU interfaces and frequent design revisions

Detailing scope

Steel framing integrated with glulam and architectural systems.

01

Steel columns and composite beams

Approximately 1,260 tons of steel were modeled for the East Terminal Expansion’s primary structure and extensive vertical bracing.

02

Glulam coordination

Steel locations and connections were coordinated with the terminal’s numerous engineered-timber members.

03

Curtain wall support tubes

Detailed tube steel framing supported the glass building envelope and remained coordinated with the primary structure.

04

Connections to existing CMU

Interfaces between new steel and existing masonry walls were developed within the coordinated structural model.

05

Drawing and revision management

Changed members, connections and adjacent-system information were reviewed and reflected in fabrication and erection drawings.

Technical complexity

Coordinating new steel with existing CMU and extensive glulam framing.

01

New steel against existing masonry

Steel-to-CMU interfaces required careful control of connection positions and geometry against existing construction.

02

Extensive steel-to-glulam interfaces

Changes in steel or timber information needed review across the relevant model areas to maintain compatible member positions and connections.

03

Glass façade support alignment

Tube framing had to satisfy curtain wall requirements while remaining coordinated with the terminal’s primary steel.

04

Frequent design revisions

Connection modifications and member-position changes continued during detailing, requiring corresponding model and drawing updates.

Our approach

Maintaining alignment as structural information evolved.

The team used the Tekla model as the central source of structural steel information.

As revised design documents and coordination information became available, affected members, connections and drawings were identified and updated. The workflow focused on maintaining consistency between:

  • current design documentation,
  • the structural model,
  • glulam coordination,
  • curtain wall support framing,
  • fabrication and erection drawings.

One coordinated model across steel, timber and the building envelope.

The structural steel package was developed in Tekla Structures.

The model brought together steel columns, composite framing, glulam beams, vertical bracing and tube steel supporting the curtain wall system. It also provided a consistent basis for coordinating the steel package with information received from other trades and BIM platforms.

The Tekla model supported the development of fabrication and erection information for WMK & Co.

Tube steel framing shaped around an expansive glass façade.

The terminal design uses extensive curtain wall systems to bring natural light into the building and provide views of the surrounding mountain landscape.

The steel scope included detailed tube steel framing supporting the glass envelope. This framing had to remain coordinated with both the primary structure and the curtain wall requirements.

Project animation

Explore the project in motion.

Project result

Detailing underway within a multi-phase airport expansion.

The structural steel detailing scope is associated with the 2025–2026 phase of the project.

The broader East Terminal Expansion is a multi-phase investment currently projected for completion in 2030. Planned improvements include an expanded Concourse A, three additional gate positions, a larger baggage claim area, a second security checkpoint and new airport administration space.