Erection simulations
Present steel erection, crane movement, site staging and construction logistics as an ordered model sequence.
Erection planning and visualization
Use model-driven simulations to review erection sequence, communicate construction phases and present the finished project before it exists.
Technical visualization services
Each output has a defined purpose: review the erection approach, explain construction progress or communicate the completed project.
Anatomic Iron's animation capabilities began with the Denver International Airport canopy erection sequence. The project demonstrated how model-driven visualization can make planned construction states easier to review and explain. That experience became the foundation for a broader suite of erection animations, phase imagery and project renderings.
Present steel erection, crane movement, site staging and construction logistics as an ordered model sequence.
Compare defined construction states from the initial structural grid through enclosure and completion.
Create finished-building and model-based views for design-build pursuits, presentations and project communication.
Interactive sequence review
Move through the Mercedes-Benz Stadium sequence in either direction. Scrub the model freely or select a construction milestone for a guided transition.
Ready to review01/ 05
Technical simulation case studies
Large-format players keep the model sequence legible. Each case study is prepared for the project metrics that communicate structural scale, schedule and simulation scope.
Featured sequence
Project sequence
Project sequence
Project data placeholders: confirmed tonnage, project or erection duration and the most important simulated milestone are still required for each case study.
Start a conversation
Discuss project scope, schedule and coordination requirements with our detailing team.